Farm Site Decommission and Demolition

Location: Fort Saskatchewan, AB

QMLP was awarded the contract to decommission and abandon 21 parcels of land in preparation for an Oil Sands Upgrader Expansion project. The contract was on a time and materials basis that turned out to be cost effective as several unknowns arose at the site upon demolition and excavation.

The scope of work included the following:

  • Decommission/ abandon 20+ water wells to Alberta Environment regulations;
  • Demolish and dispose of Farm Structures including barns, houses, and outbuildings;
  • Remove and properly dispose of Hazardous Materials;
  • Recycling of 1,000+ tonnes of tires, batteries, scrap steel, and historic farm equipment that went to the local museum;
  • Site restoration to near natural condition.